Imperial Center Infrastructure Project PHASE TWO:

County Project No. I.C. 02                

Surface and Subsurface Improvements including water, sewer, storm drain, curbs & walks, street lights & underground electrical, earthwork, signage and A.C. paving.


NOTICE:

Addendum #1 has been issued on July 6, 2010.


Addendum #2 has been issued on July 12, 2010.


Addendum #3 has been issued on July 15, 2010.


Addendum #4 has been issued on July 26, 2010.


PLANS:

Available June 24, 2010, at Planning & Development Services Dept.

801 Main Street

El Centro, CA

& this web page at the below links

 

PLANS/Specifications*

Project Manual & Bid Requirements

Exhibit A-1: EDA Contract Provisions

Exhibit A-2: Dewatering Specifications

Exhibit A-3: Prevailing Wages

Exhibit A-4: Prevailing Wages

Exhibit A-5: Certification regarding Lobbying

Exhibit A-6: Affirmative Action

Exhibit A-7: Recovery & Reinvestment Act Terms

Exhibit A-8: IID Utility Crossing Details

Exhibit A-9: EDA Project Sign

*due to various connection speeds, some files may require a 2-3 minute loading time 


BIDS DUE:

August 9, 2010 at 12:00 PM (noon) at the Clerk of the Board of Supervisors

 

BID OPENING:

August 9, 2010 at 3:00 PM in the County Board Room

 

CONTACT:

Jurg Heuberger, AICP, Planning & Development Services Director

 

PRE-BID:

A Pre-Bid conference is scheduled for July 15, 2010 at 10:00 AM at the Planning & Development Services Dept. Conference Room and attendance is non-mandatory but strongly encouraged.

 

NOTE:

(1) This project involves ARRA funding and has very strict deadlines!

(2) This project is under direction/control of Imperial County Planning & Development Services (ICPDS).

(3) This project is for extension of sewer & water to the Heber Public Utilities District (HPUD) infrastructure and as such the project will be inspected by the engineer for HPUD as well as the County.

(4) A temporary construction yard has been permitted by County to be used by contractor.

(5) CALTRANS and IID encroachment permits are pending and should be issued by time of construction.

(6) A full time Construction/Contract Manager hired by ICPDS will oversee the project.

-

 