CA Ethanol & Power

FINAL ENVIRONMENTAL IMPACT REPORT FOR
CALIFORNIA ETHANOL & POWER IMPERIAL VALLEY 1
AUGUST 2013

Final EIR Appendix
Table of Contents Appendix A - Environmental Bulletin
Introduction
Executive Summary
Response to Comments
Errata
Final MMRP
Findings

DRAFT ENVIRONMENTAL IMPACT REPORT FOR
CALIFORNIA ETHANOL & POWER IMPERIAL VALLEY 1
APRIL 2013

NOTICE OF AVAILABILITY - EXTENSION OF COMMENTS TO JUNE 21, 2013

DRAFT AMENDED Mesquite Lake SP

Draft EIR Appendices
Table of Contents Appendix A - NOP & Initial Study
Acronyms Appendix B
Glossary      Draft Traffic Impact Analysis Part 1
Executive Summary      Draft Traffic Impact Analysis Part 2
Introduction      Draft Traffic Impact Analysis Part 3
Project Description      Draft Traffic Impact Analysis Part 4
Intro to Environmental Analysis Appendix C
Environmental Analysis      Air Quality, Greenhouse Gas & Energy Part 1
     Aesthetics      Air Quality, Greenhouse Gas & Energy Part 2
     Land Use      Attachment D - ATC Permit 4212 Part 1*
     Transportation & Circulation      Attachment D - ATC Permit 4212 Part 2*
     Air Quality      Attachment E - HRA Part 1
     Climate Change      Attachment E - HRA Part 2
     Geology & Soils      Attachment E - HRA Part 3
     Cultural Resources      Attachment E - HRA Part 4 
     Noise      Attachment E - HRA Part 5
     Agricultural Resources      Attachment E - HRA Part 6
     Hazards & Hazardous Materials      Attachment E - HRA Part 7
     Hydrology & Water Quality      Attachment E - HRA Part 8
     Biological Resources      Attachment E - HRA Part 9
     Public Services & Utilities      Attachment E - HRA Part 10
Cumulative Impacts Summary      Attachment E - HRA Part 11
Alternatives      Attachment E - HRA Part 12
Other CEQA Considerations      Attachment E - HRA Part 13
List of Preparers      Attachment E - HRA Part 14
References      Attachment E - HRA Part 15
     Attachment F - The LifeCycle Associates Report
Appendix D

     Geotechnical Report Part 1
     Geotechnical Report Part 2
Appendix E - Cultural Resources Report
Appendix F - Noise Study
Appendix G - LESA Model
Appendix H - Phase 1 ESA
Appendix I - Drainage Study Report
Appendix J - Final Biological Technical Report
Appendix K - Water Supply Assessment
*large files, please allow time to load

Site Search
Privacy Policy