Vikings Solar Energy DEIR
- CUP20-0025 0.1 Cover Page
- CUP20-0025 0.2 Title Page
- CUP20-0025 0.3 Table of Contents
- CUP20-0025 1.0 Executive Summary
- CUP20-0025 2.0 Introduction
- CUP20-0025 3.0 Project Description
- CUP20-0025 4.0 Environmental Analysis
- CUP20-0025 4.1 Aesthetics
- CUP20-0025 4.2 Agricultural Forestry Resources
- CUP20-0025 4.3 Air Quality
- CUP20-0025 4.4 Biological Resources
- CUP20-0025 4.5 Cultural Resources
- CUP20-0025 4.6 Energy
- CUP20-0025 4.7 Geology and Soils
- CUP20-0025 4.8 Greenhouse Gas Emissions
- CUP20-0025 4.9 Hazards and Hazardous Materials
- CUP20-0025 4.10 Hydrology/Water Quality
- CUP20-0025 4.11 Land Use and Planning
- CUP20-0025 4.12 Mineral Resources
- CUP20-0025 4.13 Noise
- CUP20-0025 4.14 Public Services
- CUP20-0025 4.15 Transportation and Traffic
- CUP20-0025 4.16 Tribal Cultural Resources
- CUP20-0025 4.17 Utilities and Service Systems
- CUP20-0025 Analysis of Long Term-Effects
- CUP20-0025 6.0 Cumulative Impacts
- CUP20-0025 7.0 Environmental Effect Found Not To Be Significant
- CUP20-0025 8.0 Alternatives
- CUP20-0025 9.0 Preparers
- CUP20-0025 10.0 References
Appendices
- Appendix A Notice of Preparation & Initial Study
- Appendix B Public Scoping Meeting Materials/ Comments
- Appendix C Conditional Use Permit Application
- Appendix D Visual Resource Assessment
- Appendix E Land Evaluation and Site Assessment
- Appendix F Aire Quality & Greenhouse Gas Technical Report
- Appendix G Biological Resources Reports
- Appendix H Cultural Resources
- Appendix I Geotechnical Report
- Appendix J Phase I Environmental Site Assessment
- Appendix K Water Supply Assessment
- Appendix L Paleontological Resources Assessment
- Appendix M Transportation Study
- Appendix N Preliminary Drainage Report
- Appendix O Noise Technical Report